- Home
- »
- Engineering
- »
- Professional Engineering
- »
- Civil Engineering Risk Management & Construction Scheduling Expert Witness
Civil Engineering Risk Management & Construction Scheduling Expert Witness
A highly experienced academic and professional engineer with over three decades of involvement in construction engineering and management. Offers expertise in process improvement, disaster risk reduction, infrastructure maintenance, project controls, strategic planning, and risk management. Holds advanced degrees in engineering and law, alongside certifications including Professional Engineer, Certified Cost Professional, and Construction Risk Insurance Specialist. Provides consulting, expert testimony, report writing, and site inspections for legal cases involving construction and engineering disciplines.
Professional Affiliations:
International Council for Research and Innovation in Building and Construction (CIB)
National Academy of Construction (NAC)
National Consortium of Housing Research Centers (NCHRC)
Global Leadership Forum for Construction Engineering and Management Programs (GLF-CEM)
American Society of Civil Engineers (ASCE)
The Association for the Advancement of Cost Engineering (AACE International)
Construction Industry Institute (CII)
Education:
Ph.D. in Civil Engineering
Master of Science in Law
Master of Science in Civil Engineering
Bachelor of Engineering
Areas of expertise:
Civil Engineering
Construction
Construction Safety
Education & Schools
Intellectual Property
Manufactured Homes
OSHA
Patents
Professional Engineering
Risk Management
Scheduling
Delay & Analysis
Trade Secrets
Case Study:
Modular Construction
Trade Secret Misappropriation
Data Centers
Manufactured Homes
Project Controls
Construction Engineering and Management
Construction Safety
Water Usage
Road Safety
Infrastructure Rehabilitation
Infrastructure Damage Claim
Insurance Disputes
Breach of Contract
Construction and Extreme Events
Storm Damage
Loss Amount and Restitution
Certifications:
Professional Engineer (PE)
Certified Cost Professional (CCP)
Construction Risk Insurance Specialist (CRIS)
30-Hour OSHA Hazard Recognition Training
Advanced Certificates in Strategic Human Resource Management
Advanced Certificates in Financial Management
Advanced Certificates in Executive Leadership
